Ongoing Project
Awash–Kulbi–Diredawa / Harar overlay Road Project I
Location
Awash,Ethiopia
Owner
Ethiopian Road Administration
Duration
April 5, 2021– April 1, 2025
Budget
531, 425, 819.38
Consultant
Prominent Engineering Solution Plc
Length of Road
70.5 KM
Type of Construction
Overlay Road Project
Introduction
Scope of Work
The construction activities include land surveying, site preparation, earthworks, sub-base and base layer construction, asphalt or concrete pavement works, drainage system installation, and the establishment of road safety features such as signage, guardrails, and lighting systems. Where necessary, the project also involves the construction of supporting structures such as bridges, culverts, and retaining walls.
Construction Methodology
The project will be executed using industry best practices and modern engineering techniques.High-quality materials will be utilized to ensure the longevity and resilience of the roadway. Strict adherence to environmental regulations and sustainable construction practices will be maintained through out the project life cycle.
Quality and Safety Standards
All construction activities will conform to national engineering standards, ensuring the highest levels of safety, durability, and performance. Comprehensive quality control measures and safety protocols will be implemented to protect workers, the environment, and the surrounding communities.
Expected Benefits
Upon completion, the new roadway will significantly reduce travel times, lower vehicle operating costs, and enhance the accessibility of key economic zones.The project is expected to contribute to regional growth, improve road safety, and provide long-term value to the community